NM13 Pipeline Construction

Ngatamariki Steam FieldĀ 

Connection of new Production well at Pad M (NM13) at Ngatamariki Power Station to the existing two-phase line running from Pad B to the station via a new 750NB sch30 pipeline 120m in length.

The wellhead piping system included the wellhead piping of 400NB sch 160 pipe which connected to the new pipeline via a fabricated Y tee. The piping system included and additional minimum flow system, HDPE lined pond, associated civil works and structures.

This was an extremely tight time frame which Warner Construction delivered on time with a great working relationship between the project team and the sub contract companies which aided in achieving this milestone.