Taupo Geothermal

Contact Us

Taupo Geothermal

In 2012 Warner Construction were hugely successful in constructing approximately 7km of large diameter, above ground, steam field pipelines from the Te Mihi Steam Field to the Te Mihi Power Station near Taupo. The success of this project led to the establishment of a permanent office and workshop on Manuka Street in Taupo.

Building on the Warner reputation, Taupo branch offers quality general engineering, fabrication, and pipeline construction to support to the large power generating, geothermal and other Industries in the region.

Taupo Plant & Equipment

1 x Forklift
1 x 20T Terex Franna Crane
1 x 6T Isuzu Giga Max Hiab Truck
1 x 3T JCB Telehandler
2 x Isuzu Crew Cab Trucks
2 x Ford Ranger Utes
3 x Medium Trucks
5 x 400 Amp Lincoln Mobile Welding Machines
1 x 50KVA GeneratorĀ 
1 x Set of Hydro Test Equipment & Chart Recorders
Hytorc Equipment
Large Dearman Clamps and Pipe Cutters

Heavy Steel Fabrication Workshop

2.75 T Gantry Crane
Bandsaw
Punch & Shear
Thread Machine
Pipe Rotors
Drill Press
Mig Tig and MMA Welders with the latest technology

Sheet Metal, Stainless & Aluminium Workshop

6mm x 2.4 Guillotene
Lathe
0.60 Press BrakeĀ