Origin Energy
February 2009
Omata Tank Farm to Port Taranaki, New Plymouth
Length: 3.7km
Size: 450NB
This pipeline project was to weld and lower and lay the condensate export pipeline from the newly constructed Origin Energy Tank Farm to the loading arm on the Newton King Tanker Terminal. It involved working in steep green fields, road reserves and over water on the tanker terminal wharf. Our scope incorporated Cathodic Protection, Welding, Wrapping and Hydro-testing.
No albums to view yet.