Stratford Bi-Directional Metering

Contact Energy

August 2013

Stratford, Central Taranaki

Scope: Station Pipework and Foundations

Size: Various from 50NB-300NB, predominantly 300NB

The site was prepared from scratch and the foundations and pipe supports were fabricated on site, all during the middle of winter.

The pipework was fabricated entirely in our workshop and assembled on site from the field measurements. Every spool was fitted exactly.