Reids Canal Realignment

Vector Gas

June 2011

Edgecumbe, Bay of Plenty

Length: 800m

Size: 100NB

The realignment of the 502 line and the 507 line was carried out due to the realignment of Awakeri Road (SH2) and an exposed section in Reid’s Canal.

Our scope included five HDD sections, Welding, Wrapping, Lower and Lay, Hydro-testing and Drying the completed line. Two live line and station tie-ins were completed with uninterrupted gas supply.