Kowhai A-B Pipeline

Greymouth Petroleum

May 2013

Tikorangi, North Taranaki

Length: 500m

Size: 100NB

The pipeline route was through a highly congested easement with crossings of Vector Gas and Todd Energy pipelines as well as a number of existing Greymouth Petroleum pipelines. Thus required extra depth and care in working in proximity to live lines.

As well as the construction of this pipeline, the scope included cleaning and gauging of the existing 1.2km line section to Kowhai A and after tie-in hydro-testing both lines.