Greymouth Petroleum
May 2013
Tikorangi, North Taranaki
Length: 500m
Size: 100NB
The pipeline route was through a highly congested easement with crossings of Vector Gas and Todd Energy pipelines as well as a number of existing Greymouth Petroleum pipelines. Thus required extra depth and care in working in proximity to live lines.
As well as the construction of this pipeline, the scope included cleaning and gauging of the existing 1.2km line section to Kowhai A and after tie-in hydro-testing both lines.