Kupe Sales Gas Pipeline

Origin Energy

March 2008

Manaia / Kapuni, Taranaki

Length: 11.7km

Size: 250NB

This project was to weld and lower and lay the Origin Energy Sales Gas pipeline from Kupe Production Station to the Kapuni Treatment Plant tie-in to the Vector 309 pipeline for distribution. We were also responsible for weld wrapping, cathodic protection (including test points and anode bed installation) and hydro-testing and drying. Our scope of work also incorporated the fabrication and installation of the Interconnection Facility at the Kapuni tie-in.